Current Lead Times

Agreeing to our terms and conditions on your order means you are acknowledging the below.  Placing an order allocates product to you, however there may be a manufacturer's lead-time or back-order.  We frequently make changes to the below as brands provide us updates. 

* Made-to-order products are non-refundable.  Cancellations prior to shipping may be subject to 10-15% cancellation fees.  These brands are noted with (*).

 

Helly Hansen

Helly Hansen has shut down shipping until Tuesday May 31st for Memorial Day.

 

Alfa Ovens

Ovens and accessories may have a lead time of a few weeks. Please reach out for current lead time on a given item

 

Alfresco

Please contact us prior to ordering to verify the availability of the item(s) you are interested in.  Alfresco products ship direct from the distributor and stock is constantly changing.  Stock can range from in stock to a backorder of a week or two or as far out as 4-5 months. 

Artisan

Please contact us prior to ordering to verify the availability of the item(s) you are interested in.  Artisan products ship direct from the distributor and stock is constantly changing.  Stock can range from in stock to a backorder of a week or two or as far out as 4-5 months. 

 

C4 Fabrication *

Items are made-to order and have a manufacturers lead-time and a 20% restocking fee upon cancellation.

Front Bumpers have a current lead time of up to 14 weeks production time.

Rear Bumpers have a current lead time of up to 15 weeks production time.

Rock Sliders have a current lead time of up to 14 weeks production time.

Skid Plates have a current lead time of up to 15 weeks production time.

Hatch Ladder ships within 6 weeks.

Bed Racks have a current lead time of 6-8 weeks.

For any other product, please reach out for current lead times.

 

Cali Raised

Rock Sliders are 4-6 weeks raw, 6-8 weeks coated.

Bed Racks are 1-2 week lead time.

Light Bars are 7-10 day ship time.

Molle Panels 3-6 weeks lead time.

 

CBI Offroad Fab *

Items are made-to order and have a manufacturers lead-time and a 20% restocking fee upon cancellation.

Bumpers
Steel Front Bumpers | 4+ Months
Aluminum Front Bumpers | 4+ Months
Rear Bumpers | 4+ Months
Covert Bumpers | 12 Weeks

Racks & Bars
Bed Racks | 8 Weeks
Bed Bars | 3 Weeks
Prinsu Roof Racks | 2 Weeks

Rock Sliders
DOM Rock Sliders | 12 Weeks
Rock Sliders | 10 Weeks

Skid Plates
Skid Plates | 8 Weeks

Accessories
Ditch Light Brackets | 1-2 Week
CBI Accessories | 1-2 Week
Prinsu Accessories | 1-2 Week

For any other product, please reach out for current lead times.

 

Garmin

  • Current lead-times for the Garmin epix (Gen 2) Smart Watch 

    • Sapphire - Black Titanium:  Late April / early May
    • Sapphire - White Titanium:  Currently In Stock
    • Slate Steel:  Currently in Stock

 

Goose Gear *

Goose Gear made-to-order products have the following lead times:

Plate Systems: 8 weeks

Modules and Cabinets: 12 weeks

Please reach out for any questions.

 

KC HiLiTES

Roof Racks - due to an increased amount of orders, please allow for up to 8 weeks on shipments.

 

Partner Steel *

Stoves have a current fabrication lead time of 2-3 months.

 

PEAK Engineering

PEAK products ship direct to you from PEAK, lead times vary by product. Ship times can vary from a few day to several weeks.

If you have any questions, please contact us 

 

Prinsu

Prinsu Roof Racks & Top Racks | 1-2 Weeks

CBI Bed Bars | 3 Weeks

CBI Bed Racks | 8 Weeks

Prinsu Accessories | 1 Week

For any other product, please reach out for current lead times.

 

QuietKat

QuietKat Ranger E-Bike - June

 

Twin Eagles

Please contact us prior to ordering to verify the availability of the item(s) you are interested in.  Though we have some stock in our warehouse, the bulk of Twin Eagles products ship direct from the distributor and stock is constantly changing.  Stock can range from in stock to a backorder of up to 26 weeks.

Sign up for Aventuron emails